Demo content — adapted to your business and location. Contacts, prices, reviews and claims are illustrative.
your city · North Town · East Town · Nearby TownMon–Fri, 8 am – 6 pmDemo phone

What heat pumps cost in your city

The modelling fee, honest installed ranges, and the four things that decide whether the arithmetic works for your house.

Transparent pricing

Modelling has a price. So does the hardware.

Two things are for sale here and they are separate on purpose: the analysis, and the equipment. You can buy the first without ever buying the second, and about 38% of people do exactly that.

Plan comparison
IncludedModelling only$249one consultationDual fuel$9,400installed, typical homeFull electric$16,200installed, suitable homes
24 months of bills analysedIncludedIncludedIncluded
Backup element sized for design dayNot includedNot includedIncluded
Changeover set from your ratesNot includedIncludedNot included
Cold-climate heat pump installedNot includedIncludedIncluded
Envelope improvements identified firstNot includedNot includedIncluded
Existing furnace retained as backupNot includedIncludedNot included
Heat-loss model of your houseIncludedIncludedIncluded
Month-by-month operating costsIncludedIncludedIncluded
Panel capacity verifiedNot includedNot includedIncluded
Rebate paperwork filedNot includedIncludedIncluded
Two-hour home visitIncludedIncludedIncluded
Written eight-page reportIncludedIncludedIncluded
Year-one performance reviewNot includedIncludedIncluded
ChooseChooseChoose

The $249 modelling fee is credited in full if you install with us within ninety days. If the model says wait — because your furnace is four years old, or the envelope needs work first — that is the recommendation you will get, and it is the one that keeps our reviews where they are.

What decides whether the arithmetic works

Four variables. The model weighs all four, and any of them can turn a good idea into a wait.

What your envelope can hold

Insulation and air leakage decide whether full electric is sensible or an expensive mistake.

Rates at the time of modelling

The gas-versus-electric changeover point moves with rates. We use current ones and show the sensitivity.

The age of what you have

A four-year-old furnace changes the arithmetic completely. Sometimes the answer is: revisit this in six years.

Ducting and electrical

Return air capacity and panel space are the two things that most often add cost late.

Optional analysis, priced separately

Added to a consultation when the house warrants it. Each one makes the model more accurate; none of them is required.

Blower door test

Measured air leakage for the model.

+$395

Thermal imaging survey

Where the heat is actually leaving.

+$260

Second modelling scenario

A different option, fully modelled.

+$120

Electrical panel assessment

Capacity checked by an electrician.

+$180

Landlord package

Modelling across three similar units.

$620

Annual heat pump service

Coil, charge, defrost, controls.

$189 / year

Included whatever you choose

The report, the honesty and the year-one review are not the premium option. They are the practice.

  • Twenty-four months of your real utility data, not an average
  • An eight-page written report you keep regardless of what you decide
  • The changeover temperature calculated from current rates
  • Rebate applications prepared, filed and tracked to payment
  • A year-one performance review comparing bills against our model
  • A plain statement of the case against, not only the case for

Modelled within 10%, or the review is not the end of it

At the twelve-month review we compare your actual bills against our projection. If we were out by more than 10% and the cause is our model rather than your usage, we retune the system at no charge and refund the modelling fee. It has happened four times in 190 installs.

Get your house modelled

FAQ

The questions worth asking

Want to sanity-check something first? Call Demo phone and ask for Iris — she would rather talk you out of a bad idea on the phone.

Why charge for modelling at all?

Because free analysis is never neutral. Charging for it is what lets us tell 38% of clients not to buy anything.

Are the install prices firm?

They are quoted after modelling and firm once the scope is agreed. The two things that move them are return-air work and panel capacity, both checked before you sign.

Do you finance?

We handle your local utility's utility-bill financing paperwork where the equipment qualifies, and we accept standard payment methods for the balance.

What happens after the install?

Annual service is $189 and the year-one performance review is included whether or not you buy the service plan.

Find out what it would actually cost you to run

A modelling consultation is $249 and takes about two hours. You leave with an eight-page report, an operating-cost estimate by month, and no obligation whatsoever.