NOTICE: Website demonstration notice: Fictional Prairie region commercial roofing demonstration. All scope matrices, CAD planning figures, and schedules are illustrative samples.
SPEC: v2.4-MBWinnipeg & Prairie Central
Summit Commercial RoofingCAD / SCOPE

Procurement & Technical Scope Workbench • Winnipeg Hub

MODULE 02 • COMPREHENSIVE COMMERCIAL SERVICES SPECIFICATION

Commercial Roofing Services & Scope Engineering Packages

Defensible low-slope roof engineering, occupancy coordination, and independent contractor-ready tender preparation across Winnipeg and Prairie logistics facilities.

PRAIRIE CLIMATE DELTA: -40°C to +38°C
SPEC COMPLIANCE: CSA A123.21 / NBC DIV-B DEMO WORKBENCH DATASET • REV 2025.4
Facility Objective:
INDEPENDENT SPECIFICATION FRAMEWORK

Deterministic Roofing Assemblies Designed For Prairie Envelope Demands

From multi-bay distribution centers in St. James Industrial Park to food-grade refrigerated terminals in Transcona, our scopes eliminate change orders by coordinating parapet kinematics, vapor pressure, and interior crane access prior to tender issue.

R-Value Minimum: NBC Zone 7A (R-35+) Slope Standard: 1:50 Positive To Drain Vapor Retarder: Class-1 SBS Composite
TYPICAL 2-PLY SBS LOW-SLOPE ASSEMBLY ISO: DET-204
22-GA CORRUGATED STEEL DECK 12.7mm GYPSUM BOARD + SBS VAPOR RETARDER DUAL-LAYER STAGGERED ISO (R-35 MIN) 1/2" HIGH-DENSITY ISO COVER BOARD 2-PLY SBS MODIFIED BITUMEN SYSTEM REFLECTIVE COOL WHITE GRANULE
Uplift Rating: FM 1-90 Class Slope: 2.08% (1:48)
SPEC PKG • 01 CSI DIV 07 52 00

Membrane Re-Roofing & Overlay

Comprehensive tear-off or engineered recover assemblies engineered for active commercial logistics plants, light industrial complexes, and refrigerated buildings.

Occupancy & Access Controls

Engineered for 24/7 continuous warehouse operations. Pre-installed interior dust partitions, negative pressure HEPA staging, and zero disruption over racked logistics lanes.

Drainage & Penetration Engineering

Tapered polyiso re-pitching of chronic ponding sectors (minimum 1:50 gradient), expansion joints redesign, and curb elevation to an 8-inch clearance above finished membrane.

Site-Review Inputs
  • • Flute span structural gauge check
  • • Core specimen moisture % gravimetric
  • • Drone twilight thermal image log
Specialist Roles
  • • Certified Red Seal Low-Slope Techs
  • • Independent Q/A punch-list audits
  • • In-situ seam peel test inspectors
Handover Pack: As-built CAD DWG • 20-Yr Manufacturer NDL • Verified Moisture Audit
SPEC PKG • 02 ASTM C1153 THERMOGRAPHY

Condition Audits & Moisture Tracing

Precision non-destructive diagnostics isolating wet insulation cores without speculative tear-offs, delivering defensible capital reserve forecasting for property boards.

Occupancy & Sensor Protocol

Zero tenant interruption. Carried out during evening solar radiant heat dissipation using high-resolution FLIR T1020 infrared cameras, nuclear impedance meters, and Tramex RWS scanners.

Site Review Inputs

Rooftop layout plans, tenant mechanical equipment schedules, core-cut authorization approvals, and historical leak coordinate correlation logs.

FORECASTING DELIVERABLES MATRIX ASTM D7954 COMPLIANT
MAP OUTPUT Vector Moisture Contours
DECK INTEGRITY Corrosion Risk Index (1-10)
FINANCIAL 5-Year Capital Reserve Plan
Audit Output Pack: FLIR Raw Data • Core Verification Log • CAD Boundary Overlay
CODE: SPEC-MB-NDT-AUDIT Book Thermal Survey
SPEC PKG • 03 SUB-ZERO INTERVENTION

Cold-Climate Leak Tracing & Remediation

Rapid response protocols targeting extreme Prairie freeze-thaw delta anomalies, differential parapet movement, and interior condensation disguised as active leaks.

Prairie Freeze-Thaw Delta (-40°C to +35°C)

Specialized mastic compounds rated down to -25°C cure conditions. Hot-air weld validation on polymer membranes and torch-applied SBS modified base ply assemblies under harsh winter winds.

Mitigation Scope
  • • Ice damming drainage relief
  • • Internal drain thawing cables
  • • Parapet metal saddle seam seals
Testing Protocols
  • • Continuous seam probe mechanical test
  • • Blower-door air tightness diagnostics
  • • Dew-point Psychrometric analysis
Emergency Guarantee

Same-day commercial triage mobilization across Winnipeg perimeter zone with immediate temporary weatherproofing guarantee before permanent re-cladding.

Handover Pack: Triage Intervention Log • Defect Vector Photo Pack • Permanent Fix Scope
CODE: SPEC-MB-SUBZERO-EMERG Dispatch Leak Spec Team
SPEC PKG • 04 CRCA / ARCA PRESERVATION

Preventative Maintenance Programmes

Structured four-season asset protection schedules designed to satisfy insurer warranty riders, extend commercial membrane life by 8-12 years, and prevent flashings fatigue.

Q1 THAW

Scupper and drain clearings, ice ballast inspection.

Q2 UV

Pitch pocket refilling, lap sealant elastomeric rejuvenation.

Q3 WIND

Fastener pull checks, coping clip tightener audits.

Q4 FREEZE

Snow load drift baseline, mechanical curb frost-stops.

Insurer Compliance Archival

Every site inspection logs GPS-tagged photo evidence directly into your digital building envelope portal to prove compliance with Factory Mutual and manufacturer warranty clauses.

Handover Pack: Annual Envelope Audit • Condition Scorecard • Compliance Binder
SPEC PKG • 05 STRUCTURAL INTEGRATION

HVAC Curb & Penetration Coordination

Full trade engineering coordination during RTU unit changeouts, solar racking mounts, gas piping lines, and complex industrial roof penetrations.

Mechanical Sleeper & Curb Engineering

Heavy galvanized structural steel sleepers, elastomeric vibration isolation pads, and insulated prefabricated curb adapters ensuring zero thermal bridging or condensation inside ducts.

Flashing Details
  • • 24-ga Prefinished metal counter-flashing
  • • Chem-curb liquid membrane seals
  • • Continuous soldered copper flashings
Load Management
  • • Joist weight redistribution checks
  • • Crane pick rigging coordination
  • • Live-load deck deflection models
Handover Pack: Curb Isometric Details • Structural Sign-Off • Flashing Sign-Off
CODE: SPEC-MB-HVAC-INTEGRATION Coordinate HVAC Scope
SPEC PKG • 06 TENDER ARCHITECTURE

Tender Package & RFP Engineering

Turnkey, contractor-agnostic bidding specifications. We eliminate contractor ambiguity through airtight CAD details, wind uplift calculation reports, and clear line-item takeoff schedules.

Contractor-Agnostic Line Item Schedules

Unbiased scopes enabling apples-to-apples commercial roofing bids from qualified regional applicators, preventing hidden exclusions, extra markup traps, or underspecified insulation boards.

CAD Takeoff Details
  • • Level-3 Isometric parapet sections
  • • High-water overflow scupper CAD
  • • Control joint termination profiles
Calculations & Vetting
  • • CSA A123.21 Wind uplift models
  • • Dew point thermal condensation math
  • • Formal contractor bid normalization
Handover Pack: RFP Specification PDF • Master CAD Pack • Bid Analysis Matrix
CODE: SPEC-MB-TENDER-RFP Commission RFP Scope
FIELD RIGOUR & QUALITY AUDIT PROCEDURES

Jobsite Scope Verification in Action

Our engineering teams verify commercial roofing systems at critical assembly transitions before, during, and after membrane application.

MANITOBA FIELD OPERATIONS • WINNIPEG HQ
ASSEMBLY VERIFICATION

Multi-Layer Staggered Fastening

Randomized pattern pull-testing ensuring screw retention into corrugated steel flute peaks meets FM 1-90 uplift resistance criteria.

LOCATION: St. James Logistics Depot
NDT DIAGNOSTICS

Twilight Infrared Thermography

Dual-spectrum scanning capturing differential thermal retention across insulation slabs to delineate wet boundaries within ±6 inches.

LOCATION: Murray Industrial Park Terminal
PERIMETER METALWORK

High-Wind Parapet Cleating

Continuous 22-gauge starter cleat design resisting gale-force Prairie wind vortices at perimeter roof edges and expansion seams.

LOCATION: Transcona Distribution Center
ESTIMATING PREVIEW • DEMONSTRATION WORKBENCH

Service Package Comparison Matrix

UNBIASED SPECIFICATION MATRIX • WINNIPEG STANDARD
Scope Package Target Facility Life Occupancy Impact Deliverable Format Warranty Potential Lead Time
01. Membrane Re-Roofing 20–30 Years Zero Operational Shutdown CAD As-Builts, NDL Binder 20-Yr Full System NDL 3–4 Weeks Prep
02. NDT Moisture Tracing 5–10 Year Planning Zero Interior Impact FLIR Thermogram, Core Matrix ASTM C1153 Certified 48–72 Hours
03. Sub-Zero Leak Triage Immediate Winter Season Localized Bay Access Intervention Report & Recs Weather-Tight Guarantee 4–6 Hours Rapid
04. PM Stewardship Annual Ongoing Exterior/Rooftop Only Seasonal Portal Logbooks Protects NDL Compliance Scheduled Quarters
05. HVAC & Curb Coordination Life of Mechanical Unit Planned Crane Window Shop DWGs, Flashing Details Matched to Roof Base 1–2 Weeks Prior
06. Tender Package RFP Procurement Lifecycle None (Pre-Construction) Complete RFP Tender Pack Bid Enforcement Shield 2–3 Weeks Draft
ON-SITE ENGINEERING SCOPE REVIEW • GREATER WINNIPEG & MANITOBA

Request an Engineering Walk & Scope Assessment

Coordinate an on-site facility envelope walkthrough with a technical roofing specifier. Receive an objective preliminary deck core review, curb elevation log, and CSA A123.21 compliance evaluation without sales pressure.

✓ Independent Technical Spec ✓ FLIR Certified Operators ✓ No Contractor Kickbacks ✓ Fast 48-Hour Field Turnaround