Demo content — adapted to your business and location. Contacts, prices, reviews and claims are illustrative.

Half our customers need less than they were told

Currentway does EV work and nothing else, which is why the assessment comes before the sales pitch.

Tomas Ilnicki was a service electrician when EVs started arriving in your city driveways. He watched quote after quote assume a service upgrade because nobody wanted to do the load calculation — a calculation that takes twenty minutes and often says the upgrade is unnecessary.

Currentway opened in 2019 doing EV installs only, with a paid assessment as the first step. The 52% figure on this page is the whole business model: we charge for the arithmetic so we can afford to tell people the truth about it.

Eleven hundred installs later, we still lose jobs to companies promising a cheaper install without an assessment. Those customers occasionally come back after the main breaker trips in February.

How Currentway started

  1. 2019

    Tomas leaves general service work and starts Currentway on EV installs only.

  2. 2021

    Paid load assessment becomes the mandatory first step on every job.

  3. 2023

    Load-management devices added as an alternative to service upgrades.

  4. 2026

    1,180 chargers installed; 52% needed no upgrade at all.

1,180

Chargers installed

52%

Needed no service upgrade

7 yrs

Doing EV work only

4.9★

Across 260 reviews

What we hold ourselves to

Do the arithmetic

A code-method load calculation on every job, before any price is quoted.

Charge for advice

A paid assessment can say 'you need nothing'. A free one rarely does.

Stay brand-neutral

No manufacturer deals. We install what suits your car and your panel.

Who does the work

Six licensed electricians who do this work every day, which is why the estimates hold.

T

Tomas Ilnicki

Founder

Nineteen years in the trade. Still reviews every load calculation that goes out.

B

Bea Nkemelu

Assessments

Runs the remote assessment process and the rebate paperwork.

K

Karl Sigurdsson

Install lead

Handles trenching, detached garages and every condo project we take on.

If the calculation is wrong, the upgrade is on us

If we tell you your service is adequate and your charger later trips the main under normal use, we do the load-management device or the upgrade at our cost. In seven years and 1,180 installs we have paid for that twice — and both times we told the customer before they noticed.

Book a load assessment

Reviews

What EV owners say

4.9 from 260 reviews · 1,180 chargers installed

“Two other companies quoted a $4,000 service upgrade based on the panel label. Currentway did the actual calculation, said our 100-amp service was fine, and installed the charger for $980.”
AAnita RasmussenGarden Park
“Detached garage, ninety-foot trench, subpanel at the far end. They sized it for a future second car without being asked and the lawn was back to normal in three weeks.”
DDevon PilonNorth Town
“Excellent work and a clear explanation of load management versus a full upgrade. Four stars because the install slipped a week waiting on the inspection booking.”
GGrace LamSouthside

Find out whether your panel can carry a charger

Send a photo of your panel and your last two utility bills. Most of the time we can tell you the answer, and the price, without visiting.