Demo content — adapted to your business and location. Contacts, prices, reviews and claims are illustrative.

What EV charging costs in your region

The assessment, the standard install and the version with an upgrade — plus the four things that decide which one you need.

Transparent pricing

Two numbers: the assessment, then the install

We separate them on purpose. The assessment is worth having even if you never buy an install from us — and about half the time it saves you thousands.

Plan comparison
IncludedAssessment$149credited against an installStandard install$980attached garage, panel adequateInstall with upgrade$4,580charger plus 200A service
Charger mounted and commissionedNot includedIncludedIncluded
Circuits labelled and testedNot includedNot includedIncluded
Code-method load calculationIncludedIncludedIncluded
Dedicated 240 V circuitNot includedIncludedIncluded
utility disconnect coordinatedNot includedNot includedIncluded
One-year workmanship warrantyNot includedIncludedIncluded
Options priced, including doing nothingIncludedNot includedNot included
Panel replaced, 100A → 200ANot includedNot includedIncluded
Permit and inspectionNot includedIncludedIncluded
Photographs for your recordsNot includedIncludedIncluded
Uses your real consumptionIncludedNot includedNot included
Written result you keepIncludedIncludedIncluded
ChooseChooseChoose

Ask about payment options and any local incentive programs. Availability, eligibility and terms are confirmed for your location before work begins.

What changes an EV quote

Four variables, all established before you get a price.

What the calculation says

This is the whole question. Panel size alone does not answer it; your actual consumption does.

How far the run is

Twelve feet across a garage wall and ninety feet to a detached garage are different jobs.

Panel space and age

A full panel may need a sub-panel; a Federal Pioneer panel should be replaced regardless.

Charger amperage

A 48-amp charger needs more copper than a 32-amp one, and most drivers do not need 48.

Options, priced on the quote

Chosen once the calculation is done, so nothing is decided while an electrician is already standing in your garage.

Charger supply

Or install the one you already bought.

At cost + 12%

Second charger circuit

Roughed in for the future car.

+$640

Outdoor pedestal mount

For driveways with no wall.

+$820

Surge protection

Type 2 device at the panel.

+$540

Trench and restoration

Detached garage feeds.

From $1,900

Rebate paperwork

Prepared and filed for you.

Free

Included at every level

The calculation, the permit and the commissioning are not the premium option — they are the job.

  • A load calculation before any quote is issued
  • A permit pulled and the your local utility inspection booked
  • The charger commissioned and tested with your own vehicle
  • Cable routing agreed with you before anything is drilled
  • Photographs of the finished install for your records
  • A one-year workmanship warranty, in writing

If the calculation is wrong, the upgrade is on us

If we tell you your service is adequate and your charger later trips the main under normal use, we do the load-management device or the upgrade at our cost. In seven years and 1,180 installs we have paid for that twice — and both times we told the customer before they noticed.

Book a load assessment

FAQ

What EV owners ask

Not sure what your panel can take? Send photos to hello@example.com — the first answer costs nothing.

Why charge for the assessment?

Because it is the part that saves people money, and free assessments have a way of always finding an upgrade.

Is the install price firm?

Firm once the assessment is done and the route is agreed. The two things that move it are trenching and a panel with no space.

Do you supply chargers?

At cost plus 12%, or install the one you bought. We have no brand deal and no reason to push one.

How do I pay?

Deposit at booking, balance after commissioning. Card or e-transfer.

Find out whether your panel can carry a charger

Send a photo of your panel and your last two utility bills. Most of the time we can tell you the answer, and the price, without visiting.