WEBSITE DEMONSTRATION·Illustrative prairie indoor air planning consultancy
Lat 49.8954° N · Winnipeg, MB
PUREFLOW AIRMB-7A
PRAIRIE IAQ ARCHITECTURE
CAN/CSA F326-M91 DIAGNOSTIC PROTOCOL / ZONE 7A EXTREME CONTINENTAL / WINNIPEG METRO DISPATCH
INDEPENDENT THIRD-PARTY AUDIT ZERO EQUIPMENT RESELLING
TRANSPARENT ADVISORY SPECIFICATION // ESTIMATED FIELD HOURS & REPORTING

Illustrative Planning Ranges & Scoping Envelopes

Clear, measurement-grounded planning bands for Winnipeg and Red River Basin properties. Pureflow Air provides independent hourly and fixed-envelope advisory services—never equipment mark-ups. All ranges represent demonstrative planning assumptions based on physical square footage, duct complexity, and field logging intervals.

FIELD CALIBRATION STANDARD ISO/IEC 17025

Instrumentation logged to NIST standards before sub-zero transit. All airflow traverses reference to local atmospheric air density (ρ ≈ 1.29 kg/m³ @ -20°C).

Statutory Field Advisory Notice

WEBSITE DEMONSTRATION NOTICE: All pricing models and sample ranges displayed below are illustrative demonstration examples for planning discussions and do not constitute binding quotes or formal commercial bids. Formal proposals issue after architectural mechanical schedules or intake questionnaires are reviewed.

STRUCTURED TIERS

Standard Field Envelopes

BASIS: 2025 CANADIAN PRICING SCHEDULE // ZONE 7A
SPEC_LVL_01 ARCH-RES-IAQ

Scope Level I

Residential IAQ & HRV Diagnostic

$550 – $750 CAD
Fixed Envelope
TARGET ENVELOPE

Single-dwelling homes, modern airtight builds, or retrofitted envelopes encountering winter dryness or window moisture.

FIELD DURATION 2.5 – 3.5 hrs
DELIVERY 48h Diagnostic
FIELD INSTRUMENTATION

Digital Micro-Manometer, Pitot Tube Array, Core Temp/RH Dataloggers.

INCLUDED DELIVERABLES
  • HRV/ERV core balanced CFM intake vs. exhaust verification.
  • Total external static duct resistance check (ESP).
  • Winter indoor safe relative humidity target limits table.
  • Sub-zero defrost cycle thermal efficiency verification.
★ MOST REQUESTED DIAGNOSTIC
SPEC_LVL_02 AUDIT-DISTRIB-FLOW

Scope Level II

Comprehensive Distribution & Duct Audit

$1,100 – $1,650 CAD
Field + Studio
TARGET ENVELOPE

Multi-storey homes, hot/cold room variances, whistling grilles, post-renovation heating deficits, or particulate infiltration.

FIELD DURATION 4.5 – 6.0 hrs
DELIVERY Full Atlas Map
FIELD INSTRUMENTATION

Direct-capture Electronic Balometer Hood, Optical Particle Counter, Multi-point CO₂ telemetry.

INCLUDED DELIVERABLES
  • Complete register-by-register CFM distribution traverse map.
  • MERV 13 filtration drop simulation & blower motor safety check.
  • Attic plenum bypass & envelope duct leakage calculation.
  • Contractor-ready duct alteration schematic with damper notes.
SPEC_LVL_03 COMM-DOAS-62.1

Scope Level III

Commercial Suite & DOAS Commissioning

$2,200 – $3,800 CAD
Institutional
TARGET ENVELOPE

Medical clinics, design studios, light commercial suites (up to 8,000 sq.ft), or tenants needing ASHRAE 62.1 outdoor air validation.

FIELD DURATION Full Day Field
DOCUMENT Stamped Report
FIELD INSTRUMENTATION

Multi-gas Photoionization Detector, High-Volume Traverse Hood, Static Array.

INCLUDED DELIVERABLES
  • ASHRAE Standard 62.1 outdoor airflow rate balance schedule.
  • Peak-occupancy CO₂ accumulation & purging telemetry review.
  • Exhaust-to-supply envelope pressurization check (smell/cold drafts).
  • Formal IAQ verification stamp letter for tenant leases.
ESTIMATION ENGINE V2.4 // RED RIVER BASIN

Interactive Scoping Envelope Calculator

Adjust architectural variables to preview anticipated engineering site time, instrumentation protocols, and planning financial envelopes.

2,400 sq.ft
800 sq.ft (Bungalow/Suite) 5,000 sq.ft 15,000 sq.ft (Commercial complex)
ESTIMATOR TELEMETRY
YWG-SCHED-B24
INDICATIVE PLANNING RANGE
$1,150 – $1,550 CAD + GST

Independent advisory rate baseline. No contingency equipment commissions.

ESTIMATED FIELD DURATION 4.5 – 5.5 hrs Includes depressurization runs
REPORTING CYCLE 3 Business Days Vector CAD schematic included
RECOMMENDED INSTRUMENTATION RUN
Electronic Flow Hood, Dual-port Digital Manometer (0.1 Pa), Sub-Zero Hot-wire Anemometer, MERV pressure chamber.
PRIMARY FIELD CHECKPOINTS
● Register duct static balance & bedroom supply minimums
● HRV core cross-leakage & defrost temper check
● Winter relative humidity threshold limits (RH < 35%)
Initiate Advisory Discussion For This Spec Demonstrative Calculator only. Actual scoping determined following mechanical schedule review.
METRIC DEEP DIVE

Scope Attribute Matrix

Detailed breakdown of field engineering protocols, instrumentation, and deliverables associated with each Pureflow Air engagement level.

Diagnostic Parameter Scope I: Residential IAQ Scope II: Duct Audit Scope III: Commercial DOAS
Target Footprint Up to 2,200 sq.ft 1,500 – 4,500 sq.ft Up to 8,000+ sq.ft
Field On-Site Hours 2.5 – 3.5 Hours 4.5 – 6.0 Hours Full Working Day (8h+)
CFM Airflow Measurement Supply & Exhaust Core only All Grilles & Floor Boots Full Duct Traverse & Diffusers
Particulate & Aerosol IAQ Spot check (PM2.5 / PM10) Multi-point PM0.3–PM10 + CO₂ Continuous PID (VOCs, CO, CO₂, PM)
Static Pressure Testing Total External Static (ESP) Trunk drop, Filter drop, Coil drop Static array across VAV boxes & DOAS
Sub-Zero Heat Recovery Check Core temperature verification Sensible/Latent efficiency ratio Full psychrometric enthalpy calculation
Deliverable Format 4-page Diagnostic Summary Architectural Atlas & Schematic Stamped P.Eng Compliance Dossier
ENGAGEMENT PROTOCOLS

Common Scoping & Engagement Questions

Everything you need to know about our field presence, professional independence, and mechanical engineering ethics.

How does Pureflow Air structure advisory invoicing?

We operate exclusively on fixed-envelope advisory agreements or clear hourly consulting contracts. Prior to setting foot on-site, you receive a scoped confirmation memo outlining the maximum hours and required deliverables. We do not bill unexpected overages: if diagnostic logging runs longer due to our test protocols, you pay the agreed envelope.

Do you service properties outside of the Winnipeg Perimeter Highway?

Yes. We regularly dispatch across the Red River Valley, Selkirk, Steinbach, Brandon, and Interlake regional districts. Travel within the Winnipeg metropolitan area is included in the baseline scope envelope. For regional rural properties beyond 40 km from Portage & Main, a flat CRA mileage rate is transparently appended to cover vehicle mobilization and thermal sensor stabilization time.

Why do you strictly refrain from selling HVAC units or filters?

Independence is the bedrock of credible indoor air quality physics. If an auditor profits from selling you a $9,000 new furnace or proprietary duct lining, their measurements are inherently biased toward replacement. Pureflow Air sells only scientific measurements, psychrometric diagrams, and independent verification. You receive an objective engineering blueprint you can hand to any qualified mechanical contractor for honest quotes.

How do you collaborate with my existing mechanical installer or HVAC contractor?

Rather than being adversarial, high-calibre heating and sheet metal technicians welcome our reports. Contractors frequently lack the time or reference flow hoods to spend 4 hours balancing 18 individual dampers. Our reports deliver a clear, mathematically validated schedule of damper adjustments, duct enlargement cross-sections, and blower speed settings, saving trades hours of troubleshooting.

What preparation is needed on-site before your diagnostic traverse?

We request that all exterior windows, doors, and fireplace dampers remain closed for at least 6 hours prior to testing to simulate normal winter envelope pressurization. Clear access (minimum 3 ft perimeter) is required around the main furnace plenum, HRV/ERV unit, and primary return trunks. All supply grilles in tested rooms must be unobstructed by heavy furnishings.

ENGINEERING scope note

Conflict-of-Interest note

Every diagnostic run adheres to the Code of Ethics of the Association of Professional Engineers and Geoscientists of Manitoba (Engineers Geoscientists Manitoba).

CERT NO: EGM-P-44091 // DISPATCH REGISTRY
Need a Custom Commercial Scope? Multi-unit residential or schools
PRAIRIE IAQ COMMISSIONING // INITIATE YOUR ENVELOPE

Ready to benchmark your indoor air velocity?

Reach our Winnipeg lab with your mechanical floor plans, HRV serial tag, or known temperature differential zones. We provide confirmed scoping estimates within one business day.